大型工业门厂家讲解快速堆积门安装施工工艺
时间:2013-08-14 10:28 作者:未知



   

1、工艺流程
1, technological process
 
  划线定位→门洞口处理→门框内灌浆→门框就位和临时固定→门框固定→门框与墙体间隙的处理→清理→门扇安装→五金配件安装
 
Treatment and marking positioning, door, door frame, door frame and temporary fixed grouting in place, the door frame is fixed to the door frame and the wall body gap cleaning, door, hardware accessories installation
 
  2、钢质快速门操作工艺
 
2, steel fast door operation process
 
  第一步弹线定位:按设计要求尺寸、堆积门标高和方向,画出门框框口位置线。
 
The first step of elastic line location: according to the requirement of design size, stacking doors elevation and direction, draw out the mouth frame position line.
 
  第二步门框内灌浆:对于钢质快速门,需在门框内填充1:3水泥砂浆。填充前应先把门关好,将门扇开启面的门框与门扇之间的防漏孔塞上塑料盖后,方可进行填充。填充水泥不能过量,防止门框变形影响开启。
 
The second step: steel doorframe grouting for fast door, filling the 1:3 cement mortar in the doorframe. Should first close the door before the door opens filling, leak proof hole between the door frame and the surface of the plug on the plastic cover, can be filled. Filled with cement can not be excessive, to prevent deformation of open door.
 
  第三步门洞口处理:安装前检查门洞口尺寸,偏位、不垂直、不方正的要进行剔凿或抹灰处理。
 
Step third: before the installation of door opening inspection door size, deviation, not vertical, not square to chisel or plaster.
 
  第四步堆积门门框固定:采用1.5mm厚镀锌连接件固定。连接件与墙体采用膨胀螺栓固定安装。门框与门洞墙体之间预留的安装空间:胀栓固定预留20-30mm。门框每边均不应少于3个连接点。
 
The fourth step accumulation door fixed: adopt 1.5mm thick galvanized fixed connecting piece. The connecting piece and the wall body is fixed with bolts installed expansion. The reserved installation space between the door frame and the wall: expanding bolt fixed reserve 20-30mm. The door on each side should not less than 3 points of connection.
 
  第五步门框就位和临时固定:先拆掉门框下部的固定板,将门框用木楔临时固定在洞口内,经校正合格后,固定木楔。门框埋入±0.00m标高以下20mm,须保证框口上下尺寸相同,允许误差<1.5mm,对角线允许误差<2mm。
 
The fifth step doorcase perch and temporary fixed: fixed plate to remove the lower part of the door frame, door frame with wedge temporary fixed in the hole, the well calibrated, fixed. The door frame embedded ± 0.00m below the elevation of 20mm, must ensure the box mouth under the same size, the allowable error <1.5mm, diagonal error <2mm.
 
  第六步门框与墙体间隙间的处理:门框周边缝隙,用1:2水泥砂浆嵌缝牢固,应保证与墙体结成整体,经养护凝固后,在粉刷洞口及墙体。门框与墙体连接处打建筑密封胶。
 
Sixth step: the frame and the wall between the gap around the door crack, with 1:2 cement mortar caulking firmly, shall ensure that the wall to form a whole, the maintenance after solidification, to paint the hole and wall. The door frame and the wall connection hit sealant for building.